Short answer: A Homerun house materials package is the shell materials and plan set for one of 67 wood-framed floor plans, listed at $32,060 to $79,228. It covers the structure: framing, roof system, metal roofing and siding panels, windows, doors, trim and hardware. It does not cover land, foundation, labor, freight, permits, sales tax or interior finish.
We used to call these house kits. Same plans, clearer name.
What's included
- Plan set: the drawings your crew builds from, including foundation details
- Wall framing: wall height varies by plan, such as 8 or 9 ft walls
- Roof system: framed to the plan's roof pitch
- Metal roofing and siding panels
- Windows: vinyl, with the count listed per plan
- Doors, trim and hardware
Exact quantities vary by plan and are listed in your itemized quote. Renderings can show options, like shutters or stone wainscot, that are not in the base package.
Popular upgrades
- 2x6 exterior walls: more room for insulation, often asked for in colder climates
- 26-gauge metal: for the roof, siding or both
- Custom plan changes: layout changes go through a plan designer, then we price the package off the final drawings
What's not included
| Not included | Who handles it |
|---|---|
| Land and site work | You |
| Foundation or slab | You or your concrete contractor |
| Assembly labor | Your crew, or a local contractor we connect you with |
| Freight | Quoted by delivery ZIP |
| Building permit | You, through your county |
| Sales tax | Added at your delivery state's rate |
| Insulation, drywall, plumbing, electrical, HVAC, flooring | Your subs |
What it costs, with examples
| Plan | Beds / baths | Total sq ft | Base price |
|---|---|---|---|
| The Bungalow (#53) | 2 / 1 | 720 | $32,060 |
| The Classic (#1) | 3 / 2 | 1,400 | $43,450 |
| The Crossroads (#37) | 3 / 2 | 2,150 | $56,013 |
| The Estate (#39) | 4 / 3 | 2,952 | $69,446 |
| The Premier (#30) | 3 / 3 | 3,536 | $79,228 |
Across all 67 plans, base price divided by total area runs $21.75 to $44.53 per sq ft. That is a package number, not a finished-home number. Total area includes porches and other covered space, so it is larger than living area.
Why buy a package instead of sourcing it yourself
One delivery, matched to the plan. Your crew is not chasing lumberyards or waiting on backordered items mid-frame. You get one price for the shell, which makes it easier to get a construction loan approved and keep the build on schedule.
Permits and engineering
Every package comes with a plan set. Building codes vary by state and county, so ask your building department early what they require. Some require extra engineering or a local stamp. A package purchase does not guarantee permit approval.
Next step: Browse the 67 plans, pick two you like, and request a quote with your delivery ZIP. Or call 765-748-6067 and we'll walk through them with you.
FAQ
Is a house materials package a complete house?
No. It is the shell materials and plan set. Foundation, labor and interior finish are separate.
How much does a house materials package cost?
$32,060 to $79,228 across 67 plans, before freight and sales tax.
Is delivery included?
No. Freight is quoted by delivery ZIP.
Can I change the floor plan?
Yes. Custom plans are available by request. Changes are drawn first, then the package is priced off the final plan.
Do you offer pricing for contractors?
Yes. Builders ordering multiple houses can ask about wholesale pricing at 765-748-6067.
Homerun